St Peter’s Cambridge Aquatic Centre

Project Overview

In recent years, St Peter’s Cambridge had not had the correct documentation to maintain Pool Safe accreditation for its swimming pool. With a change in management, the decision was made to ensure the facility met Pool Safe accreditation once again.

St Peter’s Cambridge engaged Amotto Consultancy to complete SSOPs (site-specific operational procedures) for their swimming pool facility in order to comply with the requirements of the Pool Safe accreditation.

site specific
pool safe accreditation
heated pools modern facility

Project Outcomes

Site-Specific Operational Procedures: 

  • were written in accordance with NZS 5826:2010 Pool Water Quality, NZS 441:2008 Swimming Pool Design, and industry-specific guidelines
  • were presented St Peter’s Cambridge in a comprehensive manual.

Pool Safe Accreditation:

  • has been presented to St Peter’s Cambridge.
st peter pool outdoor
st peter pool rope
st peter pool cover
st peter control room
st peter competition pool
st peter pool roller
st peter pool
st peter buttons

Project Specifications

Client

St Peter’s Cambridge

Location

Cambridge

Project Size

Swimming pool

Completed

May 2021

Project Services

View Our Other Projects