Project Overview
Water Treatment System Report:
Second Nature Charitable Trust (the management entity of Vector Wero Whitewater Park) engaged Amotto Consultancy to provide a report on the current operations of the water treatment system. Amotto Consultancy then outlined modifications that would be required if there were changes to the current business model to include ‘in water’ activities. This report was used as the basis for the filtration system upgrade works.
Filtration System Upgrade:
The second project with Amotto Consultancy was to look at the water filtration system in use at the Vector Wero Whitewater Park, both its current state and how it could be improved and upgraded.
When Vector Wero Whitewater Park decided to proceed with the filtration system upgrade, Amotto Consultancy was engaged to perform the following roles in the four phases of the upgrade:
Phase 1 – Project management and preliminary design review
Phase 2 – Contractor engagement
Phase 3 – Project delivery
Phase 4 – Commissioning and handover.
Project Outcomes
Amotto Consultancy’s involvement in these two projects mean that the water quality at Vector Wero Whitewater Park is at the same level and comfortable for users beyond the initial intent of the operations. With the improved filtration system now in place, the facility is robust enough to function well into the future.
Project Specifications
Client
Second Nature Charitable Trust
Location
Manukau, Auckland
Completed
October 2017 – Water Treatment System Report
November 2022 – Filtration System Upgrade
Project Services
Water Treatment System Report
Filtration System Upgrade
View Our Other Projects
Bethells Beach Family Swimming Pool
Amotto Consultancy was engaged by the family to manufacture and install a…
Onehunga Family Swimming Pool
Amotto Consultancy was engaged by the family to manufacture and install a…
Jubilee Swimming Pool
Amotto Consultancy is working with H2O Systems and Auckland Council to provide…